Technically apart of our $2.5 million Blueline transit project, the installation of this freeway sign was needed because of the new freeway overpass. Although simple in design form, the efforts to produce and install were anything but. Being located under the raised trolley tracks, feet from the freeway overpass and several yards down a 45-degree slope made excavation and install efforts just a pinch more challenging than normal. A challenge our installation team most certainly rose too.
Sandag
Clear Sign & Design
Swinerton
2022
Project Owner: BioMed Realty
Designer: Clear Sign & Design
Builder: Rudolf & Sletten
Year Completed: 2019
Technically apart of our $2.5 million Blueline transit project, the installation of this freeway sign was needed because of the new freeway overpass. Although simple in design form, the efforts to produce and install were anything but. Being located under the raised trolley tracks, feet from the freeway overpass and several yards down a 45-degree slope made excavation and install efforts just a pinch more challenging than normal. A challenge our installation team most certainly rose too.
Sandag
Clear Sign & Design
Swinerton
2022
Project Owner: BioMed Realty
Designer: Clear Sign & Design
Builder: Rudolf & Sletten
Year Completed: 2019